ETTGAS LPG semi-trailer is designed to transport LPG safely on the highway with LPG tank and chassis manufactured within the scope of EN. Design and manufacturing are carried out in accordance with EN 12493 standards. Production can be made according to ASME, Merkblatt and other standards according to customer demands. Trailer chassis and moving parts are designed and manufactured by taking into account the experience and real road conditions.
Tank manufacturing is carried out by independent organizations;
100% x-ray, Penetrant and magnetic particle tests, Hydrostatic test
Tensile test according to TS EN ISO 4136, Bending test according to TS EN ISO 5173
Notch impact test according to TS EN ISO 9016:2012
Macro examination and tests are carried out and reported according to ISO 17639.
45 m3 LPG TRANSPORT TANK SPECIFICATIONS
BRAND | ETTGAS Ekrem Karoser
|
TANK TYPE | Transport
|
PROJECT CODE | EN 12493
|
WORKING TEMPERATURE | Min -20˚C / max +50˚C
|
WORKING PRESSURE | 18 bar
|
MATERIAL | P355 NH
|
DOME TYPE | Elipsoidal
|
TANK OUTER DIAMETER | 2.450 mm
|
TANK BODY THICKNESS | 10mm
|
DOME THICKNESS | 12 mm
|
TOTAL TANK LENGTH | 9000/11750
|
CORROSION ALLOWANCE | 1 mm
|
TANK VOLUME
| 45 m3
|
TANK EQUIPMENT | Manhole flange DN 500→1 piece
Flange DN 50→2 pieces
Flange DN 80→1 piece
Hydraulic→1 piece
2" Hydraulic Valve →2pcs 3’’ Hydraulic valve 1pc
3” Safety valve →3pcs
Level indicator →1pc
Manometer (0-25bar),Ø 63→1pc
Thermometer (-30 / 60 ˚ C) Ø63→1pc
Acme Adapter →3pcs
Drain valve →1pc |
PAINT | SA2.5 quality outer tank sandblasting
Epoxy primer and paint |
QUALITY CONTROL AND TESTS | Relevant tests are performed by TUVNORD, DEKRA and TSE authorities.
Material control and certification verification
X Ray
Welding procedure and competence (PQR/WPS)
Panetrant and Magnetic particle testing
Hydrostatic testing
Dimensional control |
CERTIFICATION | EN 12493 ISO 9001-2008 VE EN 9006-1
|
WELDING PROCESS | All welders have EN 9606-1 certification.
All welding is done according to the relevant PQR and WPS documentation. |
HEAT TREATMENT | Heat treatment is applied to the domes: stress relief annealing |
WAVE BREAKER | 5 pieces |